Skip to main content
← Back to F Definitions

Factory burden

What Is Factory Burden?

Factory burden, also known as manufacturing overhead or factory overhead, represents all indirect costs incurred within a manufacturing facility that cannot be directly traced to specific products or units produced. These costs are essential for the overall production process but do not include direct materials or direct labor15, 16. Factory burden is a critical component of cost accounting, a branch of managerial accounting that focuses on capturing, analyzing, and reporting a company's total production costs to aid internal decision-making. These expenses are necessary to keep the factory operational and support production activities, ensuring the smooth flow of manufacturing operations14.

History and Origin

The concept of factory burden emerged as manufacturing processes grew more complex, particularly during the late 19th and early 20th centuries. As companies moved from simple, labor-intensive production to more mechanized and integrated systems, the proportion of costs not directly attributable to individual products increased. Early cost accounting systems, developed in industries like textiles and railroads, initially focused on direct costs. However, with the rise of scientific management and more sophisticated production techniques, the need to better account for indirect expenses became apparent13.

Pioneering efforts in the early 1900s, such as those by Alexander Church, began to devise ways to account for "idle time" and other indirect costs12. The term "factory burden" itself reflects the understanding that these costs are a "burden" on the production, needing to be absorbed by the products to determine their true total cost. The evolution of cost accounting during this period aimed to provide more accurate unit costs by finding methods to allocate these indirect expenses across different products11.

Key Takeaways

  • Factory burden encompasses all indirect costs associated with the manufacturing process.
  • It includes expenses like rent, utilities, depreciation of factory equipment, and salaries of supervisory and support staff10.
  • Proper cost allocation of factory burden is crucial for accurately determining product costs and inventory valuation.
  • Understanding factory burden is vital for cost control, budgeting, and setting appropriate selling prices.
  • It is a key component in calculating the total cost of goods sold for financial reporting.

Formula and Calculation

To calculate factory burden (manufacturing overhead) applied to products, businesses typically use a predetermined overhead rate. This rate is calculated by dividing the estimated total factory burden for a period by an estimated allocation base, often referred to as a cost driver.

The formula for the predetermined overhead rate is:

Predetermined Overhead Rate=Estimated Total Factory BurdenEstimated Total Cost Driver\text{Predetermined Overhead Rate} = \frac{\text{Estimated Total Factory Burden}}{\text{Estimated Total Cost Driver}}

Once the rate is determined, the factory burden applied to each product or job is calculated as:

Applied Factory Burden=Predetermined Overhead Rate×Actual Cost Driver Usage\text{Applied Factory Burden} = \text{Predetermined Overhead Rate} \times \text{Actual Cost Driver Usage}

Common cost drivers include direct labor hours, machine hours, or direct labor costs. For example, if direct labor hours are chosen as the cost driver:

Predetermined Overhead Rate (per DLH)=Estimated Total Factory BurdenEstimated Total Direct Labor Hours\text{Predetermined Overhead Rate (per DLH)} = \frac{\text{Estimated Total Factory Burden}}{\text{Estimated Total Direct Labor Hours}}

Then, for a specific product:

Applied Factory Burden=Predetermined Overhead Rate (per DLH)×Actual Direct Labor Hours for Product\text{Applied Factory Burden} = \text{Predetermined Overhead Rate (per DLH)} \times \text{Actual Direct Labor Hours for Product}

Interpreting the Factory Burden

Interpreting factory burden involves understanding its magnitude relative to direct costs and how efficiently these indirect resources are being utilized. A high factory burden relative to direct costs might indicate a capital-intensive manufacturing process or potentially inefficient use of overhead resources. Conversely, a lower factory burden could suggest a more labor-intensive operation or effective cost control.

Analysts examine trends in factory burden over time to identify areas for efficiency improvements. For instance, an unexpected increase in utility costs (part of factory burden) could signal equipment inefficiencies or rising energy prices. The allocation of factory burden to products directly impacts their reported cost, influencing decisions related to pricing, profitability analysis, and inventory valuation. Under absorption costing, which is generally required for external financial statements under accounting principles, factory burden is included in the cost of inventory, affecting assets on the balance sheet and the cost of goods sold on the income statement9.

Hypothetical Example

Consider "Apex Manufacturing," a company that produces custom furniture. Apex needs to determine the cost of a new line of dining tables.

Last year, Apex estimated its total factory burden to be $500,000. This included rent for the factory, utilities, depreciation on woodworking machinery, salaries for factory supervisors, and maintenance personnel. They estimated they would work 100,000 direct labor hours (DLH) during the year.

Predetermined Overhead Rate = $\frac{$500,000 \text{ (Estimated Factory Burden)}}{100,000 \text{ DLH (Estimated Direct Labor Hours)}}$ = $5.00 per DLH

Now, Apex receives an order for 20 dining tables. Each table requires 15 direct labor hours to produce.

  1. Calculate total direct labor hours for the order: 20 tables * 15 DLH/table = 300 DLH.
  2. Calculate the applied factory burden for the order: 300 DLH * $5.00/DLH = $1,500.

This $1,500 represents the portion of the factory's indirect costs allocated to the production of these 20 dining tables. This amount, along with the direct materials and direct labor costs, will constitute the total product costs for the order.

Practical Applications

Factory burden is a foundational concept in various areas of financial management and operations.

  • Product Costing and Pricing: Accurately calculating factory burden allows companies to determine the full cost of producing a product. This comprehensive cost figure is essential for informed pricing decisions, ensuring that products are priced to cover all expenses and achieve desired profit margins.
  • Inventory Valuation: For financial reporting purposes, particularly under Generally Accepted Accounting Principles (GAAP), factory burden is included in the inventory valuation of work-in-process and finished goods8. This impacts the value of assets on the balance sheet and subsequently the cost of goods sold when products are sold.
  • Performance Evaluation: By tracking actual factory burden against budgeting estimates, management can evaluate the efficiency of production operations and the effectiveness of cost control measures. Variances between applied and actual factory burden can highlight operational issues or forecasting inaccuracies.
  • Decision Making: Understanding the components of factory burden helps managers make strategic decisions, such as whether to outsource production, invest in new equipment (which might increase fixed costs but reduce variable costs or vice versa), or discontinue a product line.

Limitations and Criticisms

While essential, the allocation of factory burden presents several challenges and criticisms.

  • Arbitrary Allocation: The primary criticism stems from the inherently arbitrary nature of cost allocation for indirect costs7. Unlike direct costs, which can be directly traced to a product, factory burden must be allocated using a chosen cost driver, which may not perfectly reflect how products consume overhead resources. Different allocation methods or cost drivers can lead to different product costs, potentially distorting profitability analysis for individual products6.
  • Over- or Under-Application: Because factory burden is often applied using a predetermined rate based on estimated figures, actual costs and actual activity levels may differ from estimates. This leads to either over-applied or under-applied overhead, requiring adjustments at the end of an accounting period.
  • Ignores Causality: Traditional allocation methods might not accurately reflect the actual consumption of overhead resources by different products or activities. For instance, a complex, low-volume product might consume more supervisory time or setup costs than a simple, high-volume product, even if both use the same number of direct labor hours. This issue led to the development of alternative approaches like activity-based costing, which aims to assign indirect costs based on the activities that drive them.
  • Managerial Misdirection: If product costs are distorted by inaccurate overhead allocation, managers might make suboptimal decisions regarding pricing, product mix, or process improvements, believing certain products are more or less profitable than they truly are.

Factory Burden vs. Manufacturing Overhead

The terms "factory burden" and "manufacturing overhead" are often used interchangeably in cost accounting5. Both refer to the same category of indirect costs incurred within the factory or production facility that are necessary for operations but cannot be directly traced to specific units of output.

Historically, "factory burden" was a prevalent term, emphasizing the "burden" or load these indirect costs placed on the products. Over time, "manufacturing overhead" has become the more widely adopted and contemporary term, particularly in academic texts and professional practice. Despite the slight difference in terminology, their meaning and scope remain consistent: they encompass all costs of manufacturing except direct materials and direct labor. These costs are crucial for proper expense categories in financial analysis.

FAQs

What are common examples of factory burden?

Common examples of factory burden include rent on the factory building, utilities (electricity, water, gas for the factory), depreciation of manufacturing equipment, salaries of factory supervisors, quality control staff, maintenance personnel, and janitorial staff, as well as indirect materials like lubricants for machinery or cleaning supplies3, 4.

Why is factory burden considered an indirect cost?

Factory burden is considered an indirect cost because it's difficult or impractical to trace these costs directly to a specific unit of product2. For example, the rent for an entire factory building benefits all products manufactured within it, making it impossible to assign the rent precisely to a single item. These costs support the overall production process rather than being directly incorporated into the product.

How does factory burden impact a company's financial statements?

Factory burden impacts a company's financial statements primarily through the cost of goods sold and inventory valuation. Under absorption costing, which is generally required for external reporting, factory burden is included as part of the inventoriable cost of a product. This means it becomes part of the asset value on the balance sheet until the product is sold, at which point it is expensed as part of the cost of goods sold on the income statement1.

Can factory burden be controlled or reduced?

Yes, factory burden can be controlled and reduced through effective management. Strategies include optimizing energy usage, implementing preventive maintenance schedules to reduce repair costs, improving indirect labor efficiency, negotiating better rates for utilities or rent, and identifying opportunities to streamline the overall production process. Regular budgeting and variance analysis are key tools for cost control in this area.