Skip to main content
← Back to W Definitions

Waterfall model

The waterfall model is a sequential, linear approach to project management, often employed in industries where strict adherence to a predefined plan is paramount. It falls under the broader category of traditional, phased methodologies and is characterized by distinct, consecutive stages where each phase must be completed and approved before the next one begins. This structured approach aims to ensure clarity, control, and predictability throughout a project's lifecycle. Key to the waterfall model is the extensive upfront planning and business requirements gathering, which seeks to capture all project parameters before development commences. The model's rigid structure means that any changes or deviations late in the project can be costly and challenging to implement, emphasizing the importance of detailed initial specifications and clear communication with every stakeholder.

History and Origin

The conceptual underpinnings of the waterfall model trace back to sequential processes used in engineering and manufacturing for large-scale, complex endeavors. While phased approaches to large projects, such as the construction of major infrastructure or military projects, existed for centuries, the formalization of these stages in the context of modern development is often attributed to Winston W. Royce's 1970 paper, "Managing the Development of Large Software Systems." Although Royce's paper outlined a flawed linear approach and suggested modifications for a more iterative process, his initial depiction inadvertently became known as the "waterfall model" due to its cascading, downstream progression of phases. This rigid, sequential methodology gained traction as a structured way to manage the nascent and often chaotic early days of software development life cycle projects. The emphasis on detailed documentation and distinct phases mirrored established engineering practices, offering a sense of control and predictability that was appealing for large, complex initiatives.4

Key Takeaways

  • The waterfall model is a linear, sequential project management approach with distinct phases that must be completed consecutively.
  • It emphasizes extensive upfront planning, detailed documentation, and clear project requirements established at the outset.
  • The model is best suited for projects with stable requirements and a well-understood scope, where changes are minimal.
  • Its rigidity makes it less adaptable to evolving requirements, potentially leading to costly rework if changes occur late in the project.
  • The waterfall model provides strong control and predictability, making it easier to track progress against a baseline.

Interpreting the Waterfall Model

The waterfall model is interpreted through its distinct, non-overlapping phases, each culminating in a deliverable that becomes the input for the next stage. Typical phases include requirements gathering, design, implementation, testing, deployment, and maintenance. This clear separation of stages means that project teams focus exclusively on one phase at a time. For example, during the design phase, the primary objective is to create detailed blueprints based on the previously approved requirements. There is generally no return to earlier phases once a stage is "signed off," akin to water flowing irreversibly down a waterfall.

This model is typically applied when the project's output is precisely defined from the start, leaving little room for ambiguity or change. The emphasis on a thorough feasibility study and exhaustive project planning upfront is critical, as any unforeseen requirements or design flaws discovered later can be exceptionally difficult and expensive to rectify.

Hypothetical Example

Consider a financial institution launching a new, highly regulated fixed-income trading platform using the waterfall model.

  1. Requirements Analysis: The project begins with a comprehensive collection of all regulatory, functional, and non-functional requirements from compliance, trading desks, IT security, and operations. This involves detailed interviews, document analysis, and workshops. All requirements are documented and signed off by all relevant parties.
  2. Design: Based on the approved requirements, system architects and designers create detailed technical specifications, database schemas, user interface layouts, and system integration plans. Every component of the platform is meticulously designed before any coding begins.
  3. Implementation (Coding): Developers write the code for the platform according to the approved design documents. This phase is largely self-contained, with developers focusing solely on building the components.
  4. Testing: Once all coding is complete, the entire platform undergoes rigorous testing, including unit, integration, system, user acceptance, and performance testing, to ensure it meets all specified requirements and performs as expected. Passing this phase marks a critical milestone.
  5. Deployment: After successful testing and final approval, the platform is deployed into the production environment.
  6. Maintenance: Post-deployment, the team shifts to ongoing support, bug fixes, and minor enhancements.

Throughout this process, the project manager strictly adheres to the initial budgeting and timeline, making adjustments only through formal change control processes, which are typically discouraged unless absolutely necessary due to their potential impact on the linear flow.

Practical Applications

The waterfall model is often applied in scenarios where project requirements are highly stable, clear, and unlikely to change significantly once established. This makes it suitable for certain types of financial projects, particularly those driven by stringent regulatory compliance or large-scale infrastructure upgrades with well-defined outcomes.

For instance, in the financial sector, implementing a new regulatory reporting system mandated by a government body, or upgrading a core banking system with clearly documented specifications, might leverage a waterfall approach. These projects often involve substantial capital expenditure and long-term impacts on operational expenditure, necessitating a high degree of predictability and control. The U.S. General Services Administration (GSA) acknowledges both the waterfall and agile approaches in government IT projects, indicating that a structured approach can be beneficial for specific, well-defined government initiatives.3

Furthermore, the waterfall model can be employed in projects where a thorough audit trail is crucial, as each phase generates extensive documentation. This level of detail aids in demonstrating compliance and calculating the return on investment for fixed-scope projects.

Limitations and Criticisms

Despite its advantages in predictability and control, the waterfall model faces several significant limitations and criticisms, especially in dynamic environments like financial technology. Its rigid, linear nature makes it ill-suited for projects where requirements are expected to evolve or are not fully understood at the outset. If an issue is discovered in a later phase, such as during testing, it often necessitates a costly and time-consuming rework of previous stages, potentially leading to cost overruns and project delays.

The "big design upfront" approach means that end-users or clients typically don't see a working product until very late in the development cycle, making it difficult to incorporate feedback effectively. This can result in a final product that no longer aligns with market needs or user expectations, as these may have shifted during the long development period. The model's inflexibility also struggles with scope creep, where new requirements emerge unexpectedly, as integrating them requires formal and often disruptive change requests. Many experts argue that for modern software development, particularly in fast-paced industries, the waterfall model is "dead" due to its inability to adapt quickly to changing demands.2 This rigidity can also make effective risk management challenging, as major risks related to requirements or design might only become apparent late in the project.

Waterfall Model vs. Agile Methodology

The waterfall model and agile methodology represent two fundamentally different philosophies in project management. The waterfall model is characterized by a linear, sequential progression, where each project phase is completed entirely before the next begins. This approach emphasizes upfront planning, detailed documentation, and a fixed scope. Changes are discouraged once a phase is complete, and the final product is delivered at the very end of the project lifecycle.

In contrast, agile methodology is iterative and incremental, focusing on continuous delivery of small, functional pieces of a product. Agile embraces flexibility, responding to change over following a rigid plan. Teams work in short "sprints" or iterations, incorporating feedback and adapting requirements throughout the project. Unlike the waterfall model's comprehensive upfront planning, agile planning is continuous and adaptive, allowing for rapid adjustments based on market feedback or evolving needs. For financial institutions, the shift towards agile methods, particularly in areas like financial technology (fintech), reflects a need for faster adaptation and quicker delivery cycles to keep pace with market innovation.1

FAQs

What is the primary characteristic of the waterfall model?

The primary characteristic of the waterfall model is its linear and sequential progression, where each phase of a project must be completed and approved before moving on to the next.

When is the waterfall model most suitable for a project?

The waterfall model is most suitable for projects with extremely clear, stable, and well-defined requirements that are unlikely to change. This includes projects with strong regulatory compliance needs or those involving physical construction where changes are costly and difficult.

Why is it called the "waterfall" model?

It's called the "waterfall" model because of the cascading effect from one phase to the next, much like water flowing down a waterfall. Once a phase is complete, there is no going back to a previous stage without significant effort and cost.

Can the waterfall model be used in finance?

Yes, the waterfall model can be used in finance, particularly for large, structured projects with fixed requirements, such as the implementation of certain compliance systems or upgrades to core banking infrastructure. However, for projects requiring flexibility and rapid iteration, such as new product development or fintech innovations, other methodologies are often preferred.

What are the main disadvantages of the waterfall model?

The main disadvantages include its inflexibility, difficulty in accommodating changes, late discovery of errors or misinterpretations of requirements, and the lack of client involvement until the later stages of the project. These issues can lead to increased costs and dissatisfaction if the initial understanding of the project was incomplete or changed over time.

AI Financial Advisor

Get personalized investment advice

  • AI-powered portfolio analysis
  • Smart rebalancing recommendations
  • Risk assessment & management
  • Tax-efficient strategies

Used by 30,000+ investors